{"id":20113,"date":"2026-09-21T19:36:49","date_gmt":"2026-09-21T14:06:49","guid":{"rendered":"https:\/\/thankyoubharat.com\/index.php\/2026\/09\/21\/khavda-transmission-corridor-powering-indias-green-transition\/"},"modified":"2026-09-21T19:36:49","modified_gmt":"2026-09-21T14:06:49","slug":"khavda-transmission-corridor-powering-indias-green-transition","status":"publish","type":"post","link":"https:\/\/thankyoubharat.com\/index.php\/2026\/09\/21\/khavda-transmission-corridor-powering-indias-green-transition\/","title":{"rendered":"Khavda Transmission Corridor. Powering India\u2019s Green Transition"},"content":{"rendered":"<div>\n<p class=\"wp-block-paragraph\"><strong>New Delhi [India], September 21:<\/strong> India\u2019s clean-energy transition is entering a defining phase. While expanding renewable-energy generation is essential, the real challenge is moving this power efficiently from generation-rich regions to the centres where it is needed most. A <strong>strong, resilient and future-ready transmission network<\/strong> is therefore the backbone of India\u2019s green-energy ambitions\u2014connecting renewable power with homes, industries, businesses, hospitals and other critical infrastructure.<\/p>\n<p class=\"wp-block-paragraph\">India is accelerating its clean-energy transition, targeting <strong>500 GW of non-fossil fuel capacity by 2030<\/strong>, with <strong>over 300.5 GW already achieved as of July 2026<\/strong>. As renewable generation expands, robust transmission infrastructure will be critical to deliver this clean power across regions.<\/p>\n<p class=\"wp-block-paragraph\">The <strong>Khavda region in Gujarat<\/strong> is emerging as one of the country\u2019s major renewable-energy generation hubs. India\u2019s 2030 renewable-energy ambitions therefore require not only large-scale generation but also <strong>high-capacity transmission corridors<\/strong> capable of transporting electricity over long distances and integrating it reliably into regional grids.<\/p>\n<p class=\"wp-block-paragraph\">The Maharashtra component of the project spans approximately <strong>306 Circuit KM, traversing 150 villages across five talukas<\/strong>, with four transmission lines forming an important part of this high-capacity electricity network. In simple terms, <strong>Khavda IV-C is building an electricity highway for green power<\/strong>. The value of renewable energy is ultimately realised when it can be transmitted reliably to the people and places that need it.<\/p>\n<p class=\"wp-block-paragraph\">For Maharashtra, this assumes added significance as the state continues to pursue its long-term economic growth ambitions, including its vision of becoming a <strong>USD 1 trillion economy<\/strong>. Reliable and scalable power infrastructure will remain an important enabler of industrial expansion, urban development, new businesses, digital infrastructure and improved quality of life.<\/p>\n<p class=\"wp-block-paragraph\"><em><strong>Commenting on the project\u2019s significance, Mr. Ninad Pitale, Sr. Vice President &amp; Group Head, Corporate Affairs<\/strong><\/em>, <em><strong>Resonia, said:<\/strong><\/em> <em>\u201cIndia\u2019s renewable-energy transition can achieve its full potential only when generation is matched by strong transmission infrastructure. Khavda IV-C is designed to create that critical link, moving renewable power from Gujarat to Maharashtra and supporting the state\u2019s growing energy needs. This is not simply about building transmission lines; it is about creating the infrastructure that can enable sustainable economic growth and a stronger, greener energy future.\u201d<\/em><\/p>\n<p class=\"wp-block-paragraph\">At the local level, <strong>Khavda IV-C<\/strong> is expected to strengthen the reliability of power supply to industrially developed <strong>Bhiwandi<\/strong>, as well as the <strong>Shahapur, Wada and Vikramgad regions<\/strong>. The project will also feed into the existing <strong>Nashik\u2013Babhaleshwar transmission line<\/strong>, a key source supplying power to Nashik. The <strong>Babhaleshwar\u2013Padghe line at Boisar-II<\/strong> will provide an additional source of power to the region, while helping ease the load on the existing transmission network and strengthening overall grid reliability.<\/p>\n<p class=\"wp-block-paragraph\">By ensuring a reliable power supply, the <strong>Khavda IV-C transmission project<\/strong> will stimulate investment and economic activity, create jobs, increase per capita income, and achieve sustainable inclusive growth, helping the region and the state reach its aspirational targets.<\/p>\n<p class=\"wp-block-paragraph\">Behind every transmission tower lies a larger national purpose\u2014moving electricity from where it is generated to where it is needed. <strong>Resonia\u2019s contribution goes beyond the physical construction of towers and lines; it is about creating the critical infrastructure that connects renewable energy with economic activity, communities and everyday life.<\/strong><\/p>\n<p class=\"wp-block-paragraph\"><em>If you object to the content of this press release, please notify us at pr.error.rectification@gmail.com. We will respond and rectify the situation within 24 hours.<\/em><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>New Delhi [India], September 21: India\u2019s clean-energy transition is entering a defining phase. While expanding renewable-energy generation is essential, the real challenge is moving this power efficiently from generation-rich regions to the centres where it is needed most. A strong, resilient and future-ready transmission network is therefore the backbone of India\u2019s green-energy ambitions\u2014connecting renewable power<\/p>\n","protected":false},"author":1,"featured_media":20114,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[18],"class_list":["post-20113","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national","tag-national"],"_links":{"self":[{"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/posts\/20113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/comments?post=20113"}],"version-history":[{"count":0,"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/posts\/20113\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/media\/20114"}],"wp:attachment":[{"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/media?parent=20113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/categories?post=20113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thankyoubharat.com\/index.php\/wp-json\/wp\/v2\/tags?post=20113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}